Pune Metro begins large-scale road repair works
Hindustan TimesFollowing criticism that the ongoing metro work has resulted in damaged roads, the Maha-Metro has taken up road repairs on a large scale even as it claims to have removed the barricades wherever the metro work is over. With the metro works between Vanaz and Garware, PCMC and Phugewadi, and the Regional Transport Office and Bund garden having been completed, the barricades there have been removed and the roads have been restored. On his part, the Maha Metro spokesperson said, “The Metro has always taken the stance of removing the barricades and opening the road to traffic after the works are completed. As soon as the metro work is over, the barricades will be removed and the road will be restored and road works will be taken up. From time to time, wherever work on the elevated track or the stations has been completed, the Metro has removed the barricades and restored and opened the road to traffic.