Floods in Amaravathy
The HinduWith the Amaravathi in spate, the Water Resources Department on Saturday opened the Kollidam regulator and began discharging surplus water from the Upper Anicut at Mukkombu. The opening of the Kollidam regulator to discharge surplus water is the second time within six months in a year. To prevent flooding in the delta areas and the low-lying areas of Tiruchi, the entire quantum of water realised at Mukkombu was being diverted into the Kollidam, essentially a flood carrier. R. Thayalakumar, Chief Engineer of Water Resources Department, Tiruchi, who took stock of the situation at Mukkombu, told The Hindu that it had been decided to discharge entire quantum of surplus water into the Kollidam as there was no demand for water for irrigation in delta areas.