Ganga likely to have necessary e-flow by December 15
India TV NewsThe Centre has directed hydropower and irrigation projects on Ganga to ensure a minimum and uninterrupted flow in the river by December 15, a notification said. Issued last month, the notification reduced by more than half the time that was originally given to the projects to ensure compliance with the mandated environmental flows. The National Mission for Clean Ganga in October last year had come out with a notification asking hydropower and irrigation projects to make necessary arrangements like controlled gated spillways and structural modifications in the next three years. NMCG Director General Rajiv Ranjan Mishra said the CWC submitted a report in July recommending that all the existing projects have a provision for releasing the mandated environmental flow through controlled gated spillways or water ways, and that structural modifications in the body of the project may not be required. "The central government is of the view that the time period of three years allowed to the existing projects to ensure proper compliance of the mandated environmental flows specified in the said order, is excessive and not necessary," a notification said.