WR puts Mumbai Central-Borivali line on fast track
1 year, 11 months ago

WR puts Mumbai Central-Borivali line on fast track

Hindustan Times  

Work on the sixth railway line between Mumbai Central and Borivali, which has been moving at a snail’s pace for over a decade, has picked up speed. WR puts Mumbai Central-Borivali line on fast track On Wednesday, the Western Railway began a 15-day block at Andheri station to align the tracks on platform 9. The lines 5 and 6 on the Mumbai Central-Borivali stretch are meant to separate the long-distance trains from suburban ones. Sumit Thakur, chief public relations officer for WR, said, “There will be temporary changes in these 15 days during which trains will be operated on platform 8 instead of platform 9 at Andheri station.” Among the trains that terminate on platform 9 but are extended till Churchgate are Dahanu-Andheri local that leaves at 6.05am and Bhayandar-Andheri local that departs at 4.45pm. Last February, WR acquired 444 square metre in Vile Parle and Borivali after demolishing more than 10-12 structures.

History of this topic

Western Railway finishes work on laying sixth railway track till Kandivli
3 months ago
Mumbai: Local train services of Western Railway hit due to technical issues at Borivali station
7 months, 1 week ago
Mumbai local train: THESE trains to be affected due to 8 hr block on WR. Details
1 year, 9 months ago
Mumbai local trains:Western Railway to add 40 additional services from today
4 years, 6 months ago
Mumbai's lifeline, Central line-CST, Western line-Borivali and Harbour line down due to heavy rains
5 years, 6 months ago

Discover Related