KMRL floats tender for Kochi metro’s Aluva-Angamaly extension with airport connectivity
2 months ago

KMRL floats tender for Kochi metro’s Aluva-Angamaly extension with airport connectivity

The Hindu  

Kochi Metro Rail Limited has floated tenders seeking consultancy services to prepare a detailed project report for the metro’s third-phase extension in the Aluva-Angamaly corridor with airport connectivity. While the construction of the elevated viaduct costs approximately ₹250 crore per km, it is estimated to be approximately ₹450 crore per km if an underground extension is to be built. The other requirements include daily and hourly ridership, length, number of stations, sharp curves, travel time, land acquisition cost, frequency of train operation, rolling stock and depot requirements, operational efficiency, ease of travel for passengers, ‘interchange’ difficulties, and technology selection for all civil, track and system components. The metro’s 28-km-long Aluva-Thripunithura phase-1 corridor is fully operational, while work on the 11.20-km phase-2 Kakkanad extension is under way.

History of this topic

Kochi metro’s Kakkanad extension: pre-casting of girders set to begin on March 1
1 month, 1 week ago
KMRL mulls ₹140 cr. pay-and-park project in Kochi metro’s Pink Line
1 month, 2 weeks ago
Kochi metro works will go on, despite lack of mention in Union Budget
1 month, 4 weeks ago
Trial over, KMRL’s ‘Metro Connect’ e-bus feeder service from next week
2 months, 2 weeks ago
Tripunithura residents demand KMRL to fulfil promises of park, foot overbridge
3 months, 3 weeks ago
Infopark connectivity in Kochi set to get major boost
4 months ago
KMRL to finalise detailed mobility plan in 3 months; suggestions open
8 months ago
Construction of viaduct for Kochi metro’s Kakkanad extension begins
8 months, 3 weeks ago
Metro Rail project: DMRC likely to submit detailed project report to KMRL this week
1 year, 2 months ago
KMRL keen to launch Water Metro vessels for backwater tourism in Alappuzha and Kollam
1 year, 11 months ago
First Water Metro ferry to be handed over to KMRL on Friday
3 years, 2 months ago
KMRL probing ways to increase metro footfall
3 years, 11 months ago
Kakkanad extension of metro to cost ₹1,957 crore
4 years, 2 months ago
Kochi Metro posts net loss of Rs.281.23 crore
5 years, 2 months ago
KMRL, CIAL mull metro to airport
5 years, 9 months ago
Entertainment hub in Metro City plan
6 years ago
KMRL to focus on Metro City project
8 years, 5 months ago
Land acquisition for phase II to get boost in Kochi
8 years, 7 months ago
Land acquisition for Metro Kakkanad line to begin soon
8 years, 7 months ago
KMRL to hold survey of Kochi roads
8 years, 9 months ago
Kochi Metro can save Rs 250 crore
9 years, 6 months ago

Discover Related