India's 1st vertical lift railway sea bridge completes trial run
1 month ago

India's 1st vertical lift railway sea bridge completes trial run

India Today  

A successful trial run on the newly constructed Pamban Bridge has been completed, with trains reaching speeds of 90 km/h on the Pamban-Mandapam section and 80 km/h on the bridge itself. Rail Vikas Nigam Limited is facing a major challenge in moving a 550-tonne lift span, measuring 72.5 meters in length and 16 meters in width, to its final position. The new Pamban Bridge, built parallel to the existing bridge, spans 2,070 meters and will be the longest bridge in India constructed over a bay. The successful demonstration of the bridge's vertical lift girder span has cemented its status as an engineering marvel.

History of this topic

Pamban bridge has been cleared by Commissioner of Railway Safety, says Southern Railway General Manager
3 weeks, 3 days ago
Is it time to think of a Ram Setu Express?
3 weeks, 3 days ago
Pamban Bridge: Modern engineering marvel connecting the past and future
3 weeks, 3 days ago
Railway safety commissioner flags ‘glaring lapses’ at Rameswaram Pamban bridge
3 weeks, 4 days ago
Rameshwaram's new Pamban bridge shows signs of corrosion before opening: Report
3 weeks, 4 days ago
Rameshwaram Pamban bridge nears readiness as railways conduct second test series
3 weeks, 6 days ago
Southern Railway: Rail operations to resume on new Pamban bridge by mid-November
2 months ago
Rameswaram’s supercentenarian Pamban railway bridge: Old and new
3 months, 1 week ago
New Pamban rail bridge work likely to be completed by August 31
4 months, 3 weeks ago
Wonders of Bridges: 5 Best Bridges in India
2 years, 7 months ago
Ashwini Vaishnaw Shares Visuals of 'New and Improved' Pamban Bridge in Rameswaram - News18
3 years, 2 months ago
Closing the gaps: Ten iconic bridges and how they’re changing India
3 years, 3 months ago

Discover Related