Srisailam at 858ft, AP Genco to start producing power from LBP Canal
1 year, 4 months ago

Srisailam at 858ft, AP Genco to start producing power from LBP Canal

Deccan Chronicle  

ANANTAPUR: With constant inflows and storage in the Srisailam project, the APGenco authorities announced plans on Friday to generate power from the Left Bank Power Canal. Srisailam dam recorded a level of 858.56ft with a storage of 101.66tmc-ft as against the previous 215.81tmc-ft. About 22,642 cusecs of inflows were recorded from upstream areas of Krishna basin. The TB dam board released 4,493 cusecs of water towards the high level main canal and low level canal towards Anantapur and Kurnool districts. The Tungabhadra high level main canal’s superintendent engineer Rajasekhar told DC the water was stored at various points mainly at PABR to meet the drinking and irrigation needs following allocations from TB dam based on pro rata basis. Farmers under the high level main canal have been making preparations for paddy cultivation, hoping that they would get enough water from the TB dam.

History of this topic

Srisailam Hydro Power Cuts Water Release for Agriculture
1 week, 4 days ago
Enhanced Storage at Tungabhadra Dam Even As Inflows Reduce
3 months, 3 weeks ago
Discharge of water into LBP canal resumes
4 months ago
TB dam water storage increases by seven TMC Ft after crest gate repairs
4 months ago
Discharge into LBP canal for irrigation increased to 1,300 cusecs
4 months ago
Water released into LBP canal
4 months, 1 week ago
Water release at Tungabhadra dam to help more hydel generation in Telangana, A.P.
4 months, 1 week ago
AP Genco to rise power generation to 2 MU/day at Sagar Power House
4 months, 2 weeks ago
Water Storage and Supply Disrupted in Key Telangana Irrigation Projects
4 months, 2 weeks ago
Andhra Pradesh: 10 Crest Gates of Srisailam Opened
4 months, 2 weeks ago
AP to Seek 15 tmc-ft of Krishna Water from Nagarjunasagar Dam
8 months, 3 weeks ago
Karnataka speeds up efforts for supplementary project across TB
10 months ago
Tungabhadra Dam to reduce allocations by Nov. 10; cut in allocations
1 year, 2 months ago
Telangana asks KRMB to stop AP from going ahead with RLIS
1 year, 2 months ago
Poor storage in reservoir, reduced flows upset farmers in Rayalaseema region
1 year, 4 months ago
Water released into LBP canal
1 year, 4 months ago
Stop Power Generation at Srisailam: RSSS
1 year, 4 months ago
TB Main Canal to Release 1,800 cusecs of water downstream
1 year, 4 months ago
Water released to Pothireddypadu from Srisailam
1 year, 4 months ago
AP-Genco plans capital overhaul of Srisailam Right Bank Power House in phases
1 year, 4 months ago
Worst Storage Situation in 10 Years for AP Irrigation Projects Due to Less Rainfall
1 year, 6 months ago
AP seeks curbs on TS in drawal of Krishna water
1 year, 8 months ago
Heavy inflows continue in Srisailam reservoir
2 years, 2 months ago
TS, AP in fresh row over power generation
2 years, 2 months ago
Srisailam continues to have heavy inflows; seven gates lifted
2 years, 3 months ago
Srisailam dam gates closed following dip in inflows
2 years, 4 months ago
More of inflows to major irrigation projects
2 years, 4 months ago
Gates of Srisailam Dam to be lifted today
2 years, 5 months ago
Srisailam reservoir filling up fast as Tungabhadra nears capacity
2 years, 5 months ago
Srisailam gets constant inflows from Almatti and Tungabhadra
2 years, 5 months ago
30 gates of TB lifted, threat to low-lying areas
2 years, 5 months ago
Surplus hydel power generated at Srisailam due to floodwater
4 years, 1 month ago

Discover Related