The vertical drilling from the top of the hill makes swift progress as 36 metres of drilling work has been completed so far out of the 86 metres needed to reach the 41 trapped workers in the Silkyara tunnel, as per officials. Twelve rat-hole mining experts will be involved in manual drilling and excavation horizontally through the last 10- or …